Rio Nuevo Funded Projects
- Facilities
-
updated: November 18, 2009
status: In Planning
Replacement of ageing equipment and additional expansion of the Central Plant serving the TCC complex, Police Headquarters, Fire Headquarters and the new Hotel. The capacity of the plant will expand by 33% for cooling and heating water. The project consists of installing 3 new cooling towers, 4 chil...
location: Tucson Convention Center
-
updated: November 16, 2009
status: Under Construction
The work includes a new 5,500 s.f. registration area/lobby, 3,300 s.f. enclosure and renovation of the existing east exit galleria, the addition of two (2) new escalators and an elevator adjacent to the existing galleria exit stairs, a 4,890 s.f. exterior porte cochere, necessary associated HVAC and...
location: Tucson Convention Center
-
updated: November 10, 2009
status: In Design
Includes a 35,000 s.f. exhibit hall expansion and 25,000 sf meeting room addition, necessary associated HVAC and life safety improvements; totaling 118,000 g.s.f.
location: Tucson Convention Center
-
updated: November 10, 2009
status: On Hold
Design and construct a new arena as part of the downtown redevelopment. It will include concert capacity of 10,000 to 13,000 seats, be 240,000 to 260,000 square feet, connected to a district Central Plant, and the project will meet the requirements for USGBC LEED Silver Certified.
location: West of Tucson Convention Center
-
updated: November 10, 2009
status: In Design
The original estimate was for a 1,160 space garage to be built south and adjacent to the Hotel, west and adjacent to the proposed expansion of the Convention Center, along Cushing Street.
location: Tucson Convention Center
-
updated: November 12, 2009
status: On Hold
Phase I of Tucson Origins Heritage Park included west side infrastructure of $7 million and construction of the Tucson Presidio element of the park for $2.8 million, see J003 – Presidio Stabilization and Heritage Park.
location: Westside South of Congress
-
updated: November 6, 2009
status: Completed
Presidio San Agustin is a re-creation of the historic Presidio wall constructed by the Spanish beginning in 1775. The project includes the wall and tower interpretation, exposure of a pit house, a Mexican period plaza, and a historical territorial period row house. Interpretation signage is given th...
location: corner of Church and Washington Streets
- Miscellaneous
-
updated: November 12, 2009
status: In Planning
Neighborhood Improvements to addresses lighting, sidewalks, and drainage needs within the area. Scope limited to available budget.
location: NE of Mission Lane and Grande
-
updated: November 10, 2009
status: In Design
Neighborhood Improvements to address lighting, sidewalks, and drainage needs within the area. Scope limited to available budget.
location: I-10 frontage raod to Stone Ave. and from Cushing St. to 18th St
-
updated: November 10, 2009
status: Under Construction
Underground parking garage on 5th Ave between Congress and Toole containing 283 spaces. Garage includes foundation elements for construction of New MLK Tower over the west side of garage.
location: between N 5th Av, N Toole Av, N Arizona Av, E 10th St
-
updated: November 10, 2009
status: In Design
Provide improvements to public areas around the entire depot plaza projects site including Arizona Ave, 5th Ave, and Congress St sidewalks, lighting, and landscaping as well as a new Public Pedestrian Plaza between the New MLK Tower and the future privately developed tower.
location: between N 5th Av, N Toole Av, N Arizona Av, E 10th St
-
updated: November 10, 2009
status: On Hold
Design and construction of replica of historic Mission Garden, with historically accurate sizing of adobe walls, and interior spaces designed to have plantings representing several eras of Tucson agriculture, from ancient to modern. Site infrastructure designed to include irrigation, electrical need...
location: eastern base of A-Mountain, corner of Mission Rd and Mission Ln
- 12 Projects Displayed